[ Prototype / Proof of Concept | SHIPS Version 1 | SHIPS Version 2 ]
NOTE: This is a restricted access system, and no public links are available.
Note: Thumbnails are clickable for larger screenshots.
This version was a fully functional system from start to finish. It expanded on the general system from version 1 by adding “what if” options to allow them to see how scheduling or money is affected by changing the scheduling order of ships, dropping items, or moving items.
Revised scheduling view:
Listing of alterations to be made:
Detail view of specific alteration:
Detailed view of specific alteration with category grouped subtotals and overall total:
Compiled listing of alterations, including financial info:
Compiled listing of alterations, including financial info (categorized specific totals):
Interface for data from an external application:
Rates based on external application:
The “what if” options to move or drop items in the scheduling:
Display of the results of the moved / dropped items:
Removing ship(s) from specific installations or upgrades:
Summary views of what the theoretical changes to scheduling and installations will produce:
Detail level of a specific installation or alteration:
[ Prototype / Proof of Concept | SHIPS Version 1 | SHIPS Version 2 ]