SHIPS PPM Version 2

« Back to Portfolio main

[ Prototype / Proof of Concept | SHIPS Version 1 | SHIPS Version 2 ]

NOTE: This is a restricted access system, and no public links are available.

Note: Thumbnails are clickable for larger screenshots.

This version was a fully functional system from start to finish. It expanded on the general system from version 1 by adding “what if” options to allow them to see how scheduling or money is affected by changing the scheduling order of ships, dropping items, or moving items.

 

Revised scheduling view:

ships01

Listing of alterations to be made:

ships02

Detail view of specific alteration:

ships03

Detailed view of specific alteration with category grouped subtotals and overall total:

ships04

Compiled listing of alterations, including financial info:

ships05

Compiled listing of alterations, including financial info (categorized specific totals):

ships06

Interface for data from an external application:

ships07

Rates based on external application:

ships08

The “what if” options to move or drop items in the scheduling:

ships09

Display of the results of the moved / dropped items:

ships10

Removing ship(s) from specific installations or upgrades:

ships11

Summary views of what the theoretical changes to scheduling and installations will produce:

ships12
ships13
ships14

Detail level of a specific installation or alteration:

ships15

[ Prototype / Proof of Concept | SHIPS Version 1 | SHIPS Version 2 ]

« Back to Portfolio main